Barog

Barog

0 (No reviews)
  • solan himachal pardesh

About

Barog, the engineer, was responsible for designing a tunnel near the railway station. He commenced digging the tunnel from both sides of the mountain, which is quite common as it speeds up constructi… more

Services

Not Available
Barog

Barog, the engineer, was responsible for designing a tunnel near the railway station. He commenced digging the tunnel from both sides of the mountain, which is quite common as it speeds up construction.Later it was constructed under Chief Engineer H.S. Harrington's supervision guided by a local sage, Bhalku, in a short period from July 1900 to September 1903 .

  • 0
    Reviews
  • Verified

Tags

Services

Not Available

 solan himachal pardesh

 Send Enquiry

Send Enquiry